Drainage connections and surveys sit at the start of almost every new-build or extension drainage package. A survey maps existing runs, invert levels, and connection opportunities; the connection itself joins new foul or surface-water pipework to a private system or the public sewer under the right approvals.

This page covers the installation and coordination work Mainline typically delivers on plot: excavation, formation, pipe runs to the agreed connection point, and working alongside drainage specialists or water-company teams. It is not the adoption encyclopaedia — S104 / S38 programme ownership stays on the flagship guides.

Hand over survey files in a form the designer can use — chainages, invert datums, and clear photo references beat a vague “drain runs somewhere toward the rear”.

review Groundworks Contractors in Wandsworth and Groundworks Contractors in Kingston.

When this drainage work is specified

When drawings show a new connection to an existing drain or sewer; when the route is unknown and CCTV or sonding is required before dig; or when Building Control and the water company need evidence that the connection point and falls are correct.

It also arises when an old clay or pitch-fibre run must be proven sound before you commit expensive foundation sequencing around it.

What installation typically includes

Survey work may include CCTV, dye testing, and level pickup so the designer can fix connection invert and pipe diameter. Construction then excavates to the design route, lays beds and pipes to fall, forms chambers where shown, and leaves a clean connection interface.

Where the final joint to a public sewer is water-company work, groundworks stop at the agreed demarcation. Where Mainline lays to the connection under approval, testing and records still follow the design and consent conditions.

Clash checks with foundations, services, and tree roots belong in the coordinated design — not as improvisation in the trench.

On extensions, the connection survey often reveals that the usable junction is not where the first sketch assumed. Budget a short redesign window when CCTV contradicts the assumed lateral. Protect open ends overnight so debris and surface water do not enter newly exposed pipework before the joint is made.

If this matches your project stage, send drawings and site details for a scoped quote — or call to talk through programme and access constraints.

Get an Accurate Quote

Construction sequence

  1. Step 1: Survey and confirm

    What this step delivers: Existing runs, ownership, and connection options understood.

  2. Step 2: Approve design and consent

    What this step delivers: Connection detail and any water-company approval locked.

  3. Step 3: Excavate and lay

    What this step delivers: Runs and beds to design fall and line.

  4. Step 4: Connect, test, record

    What this step delivers: Joint completed; test certificates and as-builts retained.

Common failure points and constraints

  • CCTV or drainage survey called up before design freeze
  • New foul or surface-water connection on drawings
  • Water-company connection approval pending or issued
  • Uncertain invert at the proposed junction
  • Existing pipe condition doubtful on first camera pass

Pre-install and testing checklist

  • Latest drainage layout and connection detail
  • Survey / CCTV report referenced on drawings
  • Connection consent where public sewer is involved
  • Service avoidance and temporary works plan for deep digs
  • Test method and witness requirements agreed

Install reference

StageTypical outputsCommon hold point
SurveyRoute, invert, condition, connection optionsOwnership unclear (public vs private)
DesignPipe size, fall, chamber positionsClash with foundations or services
ConstructionLaid runs, joint, testsConsent or witness not booked
Survey vs connection — what each stage usually delivers.

Coordination with structure and adoption

Install to design, complete air or water tests as specified, and hand over as-built levels at the connection. Escalate unexpected pipe condition or conflicting inverts to the designer immediately.

What drives complexity on site

Unknown existing drainage, deep connection points, live-sewer working, and confined rear gardens dominate cost. Late survey findings that force redesign are more expensive than an early CCTV day. Rate intent: /groundworks-costs. Where existing clayware or pitch fibre is found, expect the designer to call repair or replacement before you commit the connection. Record the surveyed invert at the junction — small level errors cascade into long reverse falls.

Typical scheme contexts

  • Extension foul connection to an existing lateral
  • New-build plot connection to the public sewer
  • Surface-water connection to a private drain or soakaway feed
  • Remedial connection after a failed or blocked run

Frequently asked questions

Do I always need a CCTV survey before connecting?

Not always, but it is common where the existing run is old, unmapped, or under a proposed structure. The designer and water company set the requirement.

Who makes the final joint to the public sewer?

It depends on the water-company approval. Sometimes they make the connection; sometimes an approved contractor does under their conditions. Follow the written approval.

Should the survey happen before foundation dig?

Wherever a connection or existing run could clash with foundations, survey early. Finding a conflict after concrete is poured is the expensive sequence.

We provide these services across the UK, including

Get a Free Quote

Contact us for a no-obligation quote or to discuss your project. We'll advise on the best approach and provide clear pricing.

Get an Accurate Quote

Need drainage connection groundworks? Send survey notes and drawings for a quote.

Drainage connections and surveys FAQ

Do I always need a CCTV survey before connecting?

Not always, but it is common where the existing run is old, unmapped, or under a proposed structure. The designer and water company set the requirement.

Who makes the final joint to the public sewer?

It depends on the water-company approval. Sometimes they make the connection; sometimes an approved contractor does under their conditions. Follow the written approval.

Should the survey happen before foundation dig?

Wherever a connection or existing run could clash with foundations, survey early. Finding a conflict after concrete is poured is the expensive sequence.