Soakaways dispose of surface water by infiltration. They are often used where connection to the main drain is not possible or preferred. We install to design with the correct size and connections. In Telford and Shropshire, this is most relevant when projects need a clear technical route before construction sequencing is finalised.

Projects usually reach this stage when a practical issue becomes time-sensitive and teams need a clear, location-aware implementation route. For wider planning context, see the full soakaway installation guide, or explore Groundworks Contractors in Telford.

Projects across Shropshire and surrounding areas

We deliver soakaway installation scopes across Telford and neighbouring areas where teams need a clear programme route before downstream construction phases.

When you might need this

This is typically required during early planning, redevelopment, or remedial phases where site constraints and design decisions directly affect delivery risk, programme certainty, and commercial outcomes.

How the service works

We excavate, install the soakaway (crates or rubble) and connect the drainage. We commission and provide documentation for building control or adoption.

Signs you may need this

These are typical triggers we see across Telford and Shropshire before teams move to implementation.

  • Surface water to dispose of
  • No or limited connection to main drain
  • Percolation test may be needed
  • Planning or building control conditions
  • Adoption or maintenance

What affects cost and scope

Cost and complexity are influenced by access logistics, work scale, ground conditions, disposal requirements, and project coordination factors such as temporary works, approvals, and programme interfaces in Telford.

Where this is used

Scope varies by building type, programme pressure, and operational constraints, so early planning usually improves delivery quality and speed.

  • New build surface water
  • Driveway and hardstanding drainage
  • Extension and roof drainage
  • SuDS and attenuation

How the service works

We keep delivery structured so decisions, dependencies, and handover remain clear from start to finish.

  1. Step 1: Drainage design and evidence review

    What this step delivers: Agreed location, level, construction detail and connection schedule.

  2. Step 2: Excavation and formation acceptance

    What this step delivers: Recorded formation and approval to install the storage system.

  3. Step 3: Storage, geotextile and connections

    What this step delivers: Photographic close-up record and connection checks.

  4. Step 4: Backfill, testing and maintenance handover

    What this step delivers: As-built location, levels, test record and maintenance requirements.

We deliver soakaway installation and related groundworks across Telford and Shropshire, with project scope aligned to downstream packages and handover requirements.

Engineering workflow

  1. Stage 1

    Drainage design and evidence review

    Confirm contributing area, design storage, infiltration-test results, groundwater information, exceedance route and planning or approval conditions.

    Output: Agreed location, level, construction detail and connection schedule.

  2. Stage 2

    Excavation and formation acceptance

    Excavate without smearing or damaging the infiltration surface, manage temporary water and verify dimensions and ground condition before installation.

    Output: Recorded formation and approval to install the storage system.

  3. Stage 3

    Storage, geotextile and connections

    Install crates or the designed medium, specified membrane or geotextile, inlet, inspection access and upstream silt-management components.

    Output: Photographic close-up record and connection checks.

  4. Stage 4

    Backfill, testing and maintenance handover

    Backfill with approved material, protect the system from construction traffic and provide commissioning, as-built and maintenance information.

    Output: As-built location, levels, test record and maintenance requirements.

Local site constraints to confirm

  • Insufficient plan area or conflict with foundations and services
  • Deep excavation, unstable sides or groundwater ingress
  • Restricted excavator access and limited clean backfill storage
  • Protecting the system from plant and construction traffic

Preparation before mobilisation

  • Complete infiltration testing and issue the approved drainage design.
  • Set out services, foundations and the proposed exceedance route.
  • Confirm excavation support, temporary water and material-storage arrangements.
  • Protect the installation area from sediment-laden runoff and construction traffic.

Scope clarity and handover

Commercial deliverables

  • Installation sequence and inspection plan
  • Formation, component and connection photographs
  • Product and material information
  • Commissioning or test records required by the design
  • As-built location, levels and maintenance handover

Typical exclusions to resolve

  • Drainage design and infiltration testing unless included
  • Planning, water-company or other approval fees
  • Contaminated groundwater or unsuitable-soil remediation
  • Upstream drainage alterations and landscaping outside the scheduled works

Groundworks services in Telford

We offer the following groundworks services in Telford and Shropshire. Each links to the service page for your area.

View full soakaway installation guide for wider planning context, or Discuss Your Project.

Frequently asked questions

Can a soakaway be priced before infiltration testing for a project in Telford?

Only as a provisional allowance. Testing and design determine whether infiltration is viable, the required storage and the installation depth; those inputs materially affect excavation, product and drainage scope.

What causes new soakaways to underperform for a project in Telford?

Common causes include unsuitable ground, damaged or smeared formation, incorrect storage volume, high groundwater, missing silt control, poor connection levels and construction sediment entering before handover.

What should a soakaway handover include for a project in Telford?

The handover should identify its location and levels, installed components, inspection access, relevant testing or commissioning information and the maintenance needed to control silt and preserve performance.

Is a crate soakaway always the right solution for a project in Telford?

No. The drainage designer must assess infiltration, storage, loading, groundwater, available space and approvals. A crate system is one construction option, not proof that infiltration is appropriate.

When is a soakaway required for projects in Telford?

A soakaway is typically used where surface water cannot be discharged to a suitable drain connection or where the design calls for infiltration-based disposal.